Detail

Select  

CAAV_DAAV

AUTOMATIC AIR VENT

 

 

Note:
1. Design and specifications are subject to change without prior notice.
Installation

Guide:
1. Air vent shall be installed vertically with allowance of within 5º from
the horizontal pipe line.
2. Install a gate valve or ball valve at the inlet for maintenance purposes.
3. A copper tube to be connected from the outlet of the air vent up to
drainage ditch, to prevent any leakage of the water, if any.
4. Insulate the air vent and gate valve / ball valve to prevent condensation.

Select  
Select and click catalogue request button, and the page you checked can be all downloaded.